MCP server
Georgia Energy
io.github.pipeworx-io/georgia-energy
Checked 28 Oct 2026, 09:03 UTC · Connected to it and listed its tools
Georgia (country) electricity system — live grid telemetry and regulator statistics.
Working at last checkOfficial: pipeworx.io's GitHub account (pipeworx-io)About 29,975 tokens per request once connected52 tools
https://gateway.pipeworx.io/georgia-energy/mcp
At a glance
- Type
- MCP server
- Publisher
- pipeworx.io (verified by the MCP Registry)
- Status
- Working at last check
- Tools
- 52
- Token cost
- About 29,975 tokens per request
- Sets up in
- Claude Code, Claude Desktop, Codex, Gemini CLI, Cursor, VS Code, Antigravity, ChatGPT, OpenAI API, Grok
- Last checked
- 28 Oct 2026, 09:03 UTC
Connect it to your agent
Opens the app, which shows the server and asks you to confirm. For other apps, copy the setup below.
Claude Code
claude mcp add --transport http georgia-energy https://gateway.pipeworx.io/georgia-energy/mcp
Claude Desktop
Settings → Connectors → Add custom connector, and paste the URL.
Codex (config.toml)
[mcp_servers.georgia-energy] url = "https://gateway.pipeworx.io/georgia-energy/mcp"
Gemini CLI
{"mcpServers":{"georgia-energy":{"httpUrl":"https://gateway.pipeworx.io/georgia-energy/mcp"}}}
Cursor
{"mcpServers":{"georgia-energy":{"url":"https://gateway.pipeworx.io/georgia-energy/mcp"}}}
VS Code
{"servers":{"georgia-energy":{"type":"http","url":"https://gateway.pipeworx.io/georgia-energy/mcp"}}}
Antigravity
agy mcp add georgia-energy https://gateway.pipeworx.io/georgia-energy/mcp
ChatGPT
Settings → Apps & Connectors → Advanced settings: turn on Developer mode, then Create a connector and paste the URL. Which plans can do this varies.
OpenAI API (Responses tools)
{"type":"mcp","server_label":"georgia-energy","server_url":"https://gateway.pipeworx.io/georgia-energy/mcp","require_approval":"always"}
Grok (xAI API tools)
{"type":"mcp","server_label":"georgia-energy","server_url":"https://gateway.pipeworx.io/georgia-energy/mcp"}
Tools
gnerc_prices~250 tokens
Monthly Georgian electricity prices set or recorded by the Georgian National Energy and Water Supply Regulatory Commission (GNERC), 2015 to 2026, in tetri per kWh: the average balancing-electricity sale price, the guaranteed-capacity fee, and the price ESCO paid deregulated power stations.gnerc_station_generation~343 tokens
Monthly electricity generation for individual Georgian power stations — Enguri HPP, the Vardnili cascade, Khrami 1 and 2, Zhinvali, Gardabani thermal 1 and 2, the Kartli wind farm, named solar plants — plus national supply, consumption, import, export and named large direct consumers, in million kWhgse_demand_forecast~166 tokens
Georgia's day-ahead electricity forecast published by JSC Georgian State Electrosystem: hour-by-hour total consumption, total supply, thermal / hydro (regulated and seasonal) / wind generation, and planned import and export, in MWh. Published daily, typically a day ahead.gse_frequency~174 tokens
The Georgian power system's electrical frequency in hertz, from the JSC Georgian State Electrosystem 1-minute real-time export — nominal 50 Hz, and how far it sits from nominal is a direct read on the balance between generation and demand. Carries the same ACT/SUB/NRE quality flag as the grid exportgse_grid_at~298 tokens
Georgia's national grid state at a specific past time — the same generation, tie-line and consumption blocks as gse_grid_now, with the same QUALITY flags, for one 3-minute slot. Sourced from the JSC Georgian State Electrosystem real-time export, which is retained for a rolling ~30 days; earlier timegse_grid_now~288 tokens
Georgia's national electricity grid right now: hydro, thermal, wind and solar generation, total generation, cross-border flow on the Azerbaijan, Armenia, Russia (Salkhino/Java/Nakaduli lines) and Turkey tie lines, and total consumption — in MW as a 3-minute moving average. Sourced from the JSC Georggse_publications~385 tokens
Reports and notices published by JSC Georgian State Electrosystem, Georgia's transmission system operator — including the Generation Adequacy Assessment (the medium and long-term supply-adequacy outlook), annual reports, independent auditor's reports, donor-organisation reports and the Strategic Envgse_tenders~251 tokens
Procurement tenders run by JSC Georgian State Electrosystem, the Georgian electricity transmission system operator — substation and transmission-line construction, primary equipment supply, consultancy — with the awarded bidder, contract reference and bid prices where GSE has published them. Availab
Browse
Related MCP servers
- Neso
NESO MCP — Great Britain electricity grid open data (api.neso.energy) - DC Hub — Data Center Energy, Electricity & Power Grid Data: Site Selection, Colocation, Gas, Fiber
Data center energy, electricity & power grid data: DCPI to query and cite, capacity to buy or lease. - Theaslangroupllc Pulsenetwork
914 paid market-data & token-safety endpoints — keyless x402 USDC: Base, Solana, XRPL, +8 chains - Energy Charts
Energy-Charts (Fraunhofer ISE) MCP — European electricity generation, prices, and capacity.… - SpotWave electricity prices
Live day-ahead electricity prices for 40+ European markets, all-in with taxes and VAT. - Swiss Living Index
Official Swiss data for all 26 cantons and 2,100 communes: tax, rent, health premiums, fuel, jobs. - Carbon
Carbon MCP — UK Carbon Intensity API (free, no auth) - Environment & energy
UK river levels and rainfall, bathing waters, flood warnings, weather, earthquakes and the GB…
Badge for your README
[](https://aptlynx.net/servers/io.github.pipeworx-io/georgia-energy)
Listing text is written by the maker; AptLynx lists tools and does not vouch for them. Find another tool · Browse by topic · For agents