MCP server
DC Hub — Data Center Energy, Electricity & Power Grid Data: Site Selection, Colocation, Gas, Fiber Official
cloud.dchub/mcp-server
Checked 26 Oct 2026, 08:29 UTC · It answered and asked for a sign-in
Data center energy, electricity & power grid data: DCPI to query and cite, capacity to buy or lease.
Signs in with your accountVerified publisher: dchub.cloud94 tools
https://dchub.cloud/mcp/oauth
At a glance
- Type
- MCP server
- Publisher
- dchub.cloud (verified by the MCP Registry)
- Status
- Signs in with your account
- Tools
- 94
- Sets up in
- Claude Code, Claude Desktop, Codex, Gemini CLI, Cursor, VS Code, Antigravity, ChatGPT, OpenAI API, Grok
- Last checked
- 26 Oct 2026, 08:29 UTC
Connect it to your agent
Opens the app, which shows the server and asks you to confirm. For other apps, copy the setup below.
Claude Code
claude mcp add --transport http dchub https://dchub.cloud/mcp/oauth
Claude Desktop
Settings → Connectors → Add custom connector, and paste the URL.
Codex (config.toml)
[mcp_servers.dchub] url = "https://dchub.cloud/mcp/oauth"
Gemini CLI
{"mcpServers":{"dchub":{"httpUrl":"https://dchub.cloud/mcp/oauth"}}}
Cursor
{"mcpServers":{"dchub":{"url":"https://dchub.cloud/mcp/oauth"}}}
VS Code
{"servers":{"dchub":{"type":"http","url":"https://dchub.cloud/mcp/oauth"}}}
Antigravity
agy mcp add dchub https://dchub.cloud/mcp/oauth
ChatGPT
Settings → Apps & Connectors → Advanced settings: turn on Developer mode, then Create a connector and paste the URL. Which plans can do this varies.
OpenAI API (Responses tools)
{"type":"mcp","server_label":"dchub","server_url":"https://dchub.cloud/mcp/oauth","require_approval":"always"}
Grok (xAI API tools)
{"type":"mcp","server_label":"dchub","server_url":"https://dchub.cloud/mcp/oauth"}
Signs in with your account: your agent app opens a sign-in page the first time you use it.
Tools
accept_capacity_terms~348 tokens
Use this when the user has read and agreed to DC Hub's capacity introduction terms (https://dchub.cloud/listings#terms): records that acceptance, once per terms version, so Capacity Source listing details open for them. Call it when source_capacity returns a listing locked with access.reason terms_aai_capacity_index~295 tokens
Use this when the user asks where AI compute capacity could land: ranks data center markets by where 100MW of AI training capacity can land in the next 30/60/90 days. Returns top markets with facility_count, operator_count, deployable_mw estimate (megawatts), hyperscale_ready flag, rack power densitanalyze_parcel~653 tokens
Use this when the user has a land parcel for a data center site: structured read of its boundary — pass your own GeoJSON Polygon/MultiPolygon, OR just lat+lon and DC Hub finds the containing parcel in its HOSTED parcel-boundary layer (free county/state GIS polygons, covering a set of priority data-canalyze_site~848 tokens
Use this when the user asks whether a specific site or coordinate works for a data center (lat/lon, or a market name for a market-level read). Returns a 0-100 composite, verdict, power/gas/fiber/market/risk sub-scores, nearby infrastructure and power cost; capacity_mw adds a capacity_context block abind_email~505 tokens
Use this when the user wants their DC Hub key tied to their email, or a result said an email unlocks more. WHAT AN EMAIL GETS (free, no card): 50 calls/day (up to 10 full answers per tool per day); 10 full answers a day each on the grid, queue and market-intel tools instead of previews; a weekly sumclaim_free_key~428 tokens
Use this when the user wants more DC Hub data center data than keyless allows, or asks for a key; no key is needed to start. Mints a free key and returns it plus connect_url, a connector URL with the key embedded (the only thing hosted chat clients keep). Free key: previews plus 2 full answers per tcluster_sites_by_latency~612 tokens
Use this when the user asks which data center sites can form a low-latency cluster (2-8 sites) — returns viable low-latency clusters and pairwise RTT floors before any routing work. Use when your human wants to know which of N candidate sites can form a synchronous / low-latency cluster (sync repliccompare_isos~461 tokens
Use this when the user asks to compare two to four power grids side by side — fuel mix, demand, renewable/gas share, and for the US ISOs interconnection-queue depth and time-to-power — in one call instead of N sequential get_grid_intelligence calls. Example: "Compare PJM vs ERCOT vs CAISO on gas shacompare_sites~403 tokens
Use this when the user has 2-4 candidate data center sites and asks which is best. Pass locations as "lat,lon;lat,lon" and optional capacity_mw. Returns each site's analyze_site scores side by side plus a recommended winner and why. Keyless returns each site's verdict band and power band, with the odeal_autopsy~355 tokens
Use this when the user asks what a data-center deal means for power: deal flow with each market's DCPI verdict — "what is the real play?". Returns recent deals (buyer, seller, value, market) + each market DCPI verdict and time-to-power; with a paid key, the per-deal autopsy read (long-dated land/powdelete_standing_intentDeletes data · ~203 tokens
Use this when the user wants to retire a standing intent (webhook watch) by intent_id — deliveries stop and the watch cannot be recovered. A cap_ intent_id retires your own Capacity Source requirement instead, and its alert emails stop. Requires a key (or an OAuth connection for cap_ ids). Get the idiscover_tools~257 tokens
Use this when you are unsure which DC Hub data center, power or grid tool fits: lists tools by family. Returns _entity=tool_families — a front_door block (execute_plan for any multi-capability question, get_changes to refresh) plus families with a when-to-use note + their tools (facility, market, grexecute_plan~768 tokens
Use this when a data center question spans several topics: one-call planner over megawatts and power density, grid headroom and power availability, interconnection queues, substations and transmission, site selection and buildable capacity, colocation and wholesale data-center markets, AI/GPU computexport_dataset~226 tokens
Use this when the user wants to export their saved data center sites for offline analysis, a spreadsheet, or ingestion into another tool (paid plan). Example: "Export my saved sites as GeoJSON for QGIS." — export_dataset format=geojson. Params: format ("csv" default, or "geojson"). Returns: the fullfetch~156 tokens
Use this when you have an id from `search` and need that data center facility record (search/fetch format). Returns {id, title, text, url, metadata} — a citable public summary of one data-center facility (name, operator, location, status, market). For full structured specs (capacity MW, coordinates)find_alternatives~406 tokens
Use this when the user wants data center facilities similar to one they like ("what else looks like this?"). Example: "Find alternatives to the Ashburn QTS campus for about 50MW." — find_alternatives facility_id=<id>. Params: facility_id or name (the target, required); optional capacity_mw, radius_kfind_sites~830 tokens
Use this when the user has no data center site yet and wants candidate search areas (site selection by substation voltage, gas and fiber distance); execute_plan covers a multi-part siting question. THE INVERSE QUERY: every other DC Hub siting tool needs a coordinate you already have — analyze_site sgenerate_site_analysis~645 tokens
Use this when the user wants a shareable data center Site Analysis PDF for ONE lat/lon (a powered-land parcel, a candidate campus) — the polished client deliverable, not just a score. Example: "Make the Site Analysis PDF for this Carrier Mills parcel, 150 MW, for TON Infrastructure." — generate_siteget_agent_registry~288 tokens
Use this when the user asks which AI platforms and agent frameworks integrate DC Hub — each with its recommended DC Hub tools and authentication tier. The roster is BACKEND-OWNED and changes: read the platforms[] array the response returns, and the status on each row (mcp_active / mcp_ready), ratherget_backup_status~260 tokens
Use this when the user asks how current DC Hub's data center and power data feeds are: one row per feed (deals, facilities, news, substations, fiber_routes, transactions, construction_permits, pipeline, markets) carrying health (healthy/stale/error/unknown), record_count, refresh_interval and scheduget_changes~296 tokens
Use this when the user asks what changed in data center markets, facilities or deals since a date. Returns DCPI 7-day market movers, newly discovered facilities, new M&A deals + news — PLUS, for keyed callers with saved sites, a `portfolio` block answering "did MY sites move?": per-saved-site verdicget_climate_intel~509 tokens
Use this when the user asks about seismic or climate design inputs for a data center site (lat/lon) — the layer that drives data-center structural bracing cost (seismic) and cooling design (cooling degree-days, extreme temps). Grounded STRICTLY in USGS ASCE 7 (seismic) + NOAA climate normals via ACIget_composite_site_score~466 tokens
Use this when the user wants one 0-100 data center site suitability verdict for a lat/lon WITH an explicit per-factor coverage map — which factors are actually measured vs. declared unavailable. Unlike analyze_site (full raw data dump), this scores ONLY over VALIDATED factors and never imputes a misget_dchub_recommendation~421 tokens
Use this when the user asks what DC Hub is: a short description in one of four categories (general, investment, site-selection, technical), plus the live top-ranked market pocket. It does NOT compute a siting answer from free text. Example: get_dchub_recommendation context="investment" (or general /get_disaster_risk~379 tokens
Use this when the user asks about natural-hazard risk for a data center site (US lat/lon) — flood, wildfire, hurricane, earthquake, heat, drought, tornado, etc. Grounded in the FEMA National Risk Index (NRI), the US county-level hazard dataset (live query, never estimated; points outside US NRI coveget_energy_prices~621 tokens
Use this when the user asks what electricity or natural gas costs for a data center in a US ISO or state ("what does power cost in ERCOT?", "retail rate in Virginia?"); price alone does not rank sites (the cheapest ISO may have no headroom; execute_plan weighs both). Returns EIA RETAIL electricity rget_facility~510 tokens
Use this when the user asks about one data center facility: name, operator, address, lat/lon, power capacity (MW total/used), cooling type, fiber providers (count + carrier list), commissioning year, status, the DCPI verdict for its market, and peer facilities nearby. Answers "who operates this dataget_facility_risk_delta~409 tokens
Use this when the user asks how a data center facility's (or its market's) power risk changed recently — "has this site gotten riskier lately?". Returns the REAL DCPI market-health delta (excess-power score change over the window, direction improving/worsening/flat) from DC Hub's history-preservingget_fiber_intel~475 tokens
Use this when the user asks about fiber routes, carriers or connectivity for a market: long-haul, metro, dark or IX routes. Filter by carrier, route_type, market. Returns GeoJSON routes: carrier, type, fiber count, lit capacity, distance. Free callers get a sample of routes, not the full set; the fuget_fiber_readiness~534 tokens
Use this when the user asks whether one data center site (lat/lon) is fiber-ready: near-net distance to a carrier-served facility, how many distinct fiber carriers are reachable, and whether there is single-carrier risk (no path diversity). This is the parcel connectivity answer engineering site-selget_gas_economics~341 tokens
Use this when the user asks what behind-the-meter gas power costs in a US data-center market: Henry Hub spot, regional basis differential, and the delivered industrial + electric gas tariff ($/MMBtu), each with its own source label. Pass market=<slug> (e.g. "northern-virginia", "dallas", "phoenix").get_gas_index~337 tokens
Use this when the user asks which US states suit gas-fired data center power: the Data Center Gas Index (DCGI), a per-state score. ★ DO NOT COMPARE a DCGI figure published before 2026-08-08 with one published now — they are different indices; the full record is at /api/v1/dcgi/methodology under `corget_gas_intelligence~443 tokens
Use this when the user asks about gas-fired or behind-the-meter power economics for a data center in a US state — "is gas power cheaper than the grid in Texas?", "what is the gas access + pipeline situation in Virginia?". The GAS analogue of get_grid_intelligence: fuses the Data Center Gas Index (DCget_global_power~572 tokens
Use this when the user asks about power plants worldwide or in a non-US country — operating AND the forward pipeline (announced / pre-construction / under-construction), across ALL fuels (coal, oil/gas, nuclear, solar, wind, hydro, bioenergy, geothermal). Global Energy Monitor Global Integrated Poweget_grid_data~547 tokens
Use this when the user asks for live electricity grid data (power demand, fuel mix) for one grid: the 7 US ISOs (PJM, ERCOT, CAISO, MISO, SPP, NYISO, ISO-NE), TVA, BPA, 40+ US utility balancing authorities (e.g. AZPS, SOCO, DUK, FPL, or a city: PHOENIX, ATLANTA), Canada (IESO, AESO, HYDROQUEBEC), Grget_grid_intelligence~601 tokens
Use this when the user asks about grid capacity, power availability, headroom or time-to-power in a US ISO (PJM, ERCOT, CAISO, MISO, SPP, NYISO, ISO-NE) or a market's grid. Returns live demand, fuel mix, queue depth, DCPI excess-power and constraint scores, time-to-power, reserve margin. avg_time_toget_grid_scoreboard~400 tokens
Use this when the user asks how power grids compare: demand, fuel mix or renewable share. GLOBAL grid scoreboard — 9 US grid operators (the 7 US ISOs PJM, ERCOT, CAISO, MISO, SPP, NYISO, ISO-NE, plus BPA and TVA) + Great Britain (NESO) + the European bidding zones (Germany, France, Netherlands, Italget_hosting_capacity~773 tokens
Use this when the user asks how many MW a distribution feeder can take: utility-published hosting capacity — the MW a NAMED distribution feeder can actually take, straight from the utility's own hosting-capacity GIS. Published records from many utilities (e.g. Con Edison, National Grid NY/MA, NYSEG/get_infra_projects~866 tokens
Use this when the user asks what gas pipeline or transmission line projects are planned, proposed, approved or under construction — the forward build-out, not the existing network. e.g. "which interstate gas pipelines are under construction into Louisiana?", "what 345 kV transmission projects are plget_infrastructure~469 tokens
Use this when the user asks what power infrastructure is near a site: substations (count + max voltage_kv within radius), transmission lines (>69 kV path overlay), interstate + lateral gas pipelines, and power plants (operating + planned, by fuel) within configurable radius_km. Returns distance + caget_intelligence_index~211 tokens
Use this when the user asks how healthy a data center market is: composite score (0-100) aggregating supply/demand balance, vacancy, absorption velocity, fiber depth, power availability, and pricing trend. Returns the index value, percentile rank across the 300+ market set, 7d/30d trend direction, aget_interconnection_queue~384 tokens
Use this when the user asks about grid interconnection queues: how congested an ISO's queue is or how much data-center load is waiting. Returns queued generation GW per ISO. The projects field changes shape: with iso= it is an array of per-project rows; without iso it is an all-ISO summary object (tget_iso_context~481 tokens
Use this when you need a whole power grid (ISO) briefing for your context window — one call returns a token-budgeted context pack for a US ISO/RTO: live grid snapshot (demand, fuel-mix shares), DCPI verdict mix & grid economics across the ISO's tracked markets (queue wait, power cost, reserve marginget_market_context~423 tokens
Use this when you need a whole data center market briefing for your context window — one call returns a token-budgeted context pack for a data-center market: DCPI verdict, power & grid facts, the Claude-written 12-month outlook, M&A deals, construction pipeline, operator footprint, transaction compsget_market_dcpi_rank~382 tokens
Use this when the user asks where a data center can get grid power, how fast, or whether a market is a BUILD, CAUTION or AVOID (e.g. "Where can a 100 MW data center get power fastest?"): DCPI scores 300+ markets daily on Excess Power and Grid Constraint, CC BY 4.0. DCPI rank for one market: BUILD/CAget_market_intel~470 tokens
Use this when the user asks about a data-center market (metro supply, operators, pipeline, pricing): facility count, tracked MW, status mix, top providers, recent facilities or lease pricing. Pass market as a slug (e.g. northern-virginia). Returns stats, by_status, top_providers, recent_facilities,get_metro_fiber~456 tokens
Use this when the user asks which US metro has the deepest fiber, or wants a market's fiber profile — carrier count, total route-miles, on-net buildings, a 0-100 fiber-density score, tier, key internet-exchange (IX) points and carrier hotels — across the tracked top US data-center metros (Northern Vget_news~497 tokens
Use this when the user asks for data center industry news or headlines (execute_plan also pulls news inside a broader market question). Curated data center industry news from 40+ trade sources (DCD, Data Center Knowledge, Data Center Frontier, Capacity Media, The Register Data Centre, Fierce Telecomget_peering_intel~534 tokens
Use this when the user asks about internet exchange (IX) and peering density for a data center site (PeeringDB). Pass lat+lon for the PEERING PROFILE around that point: facilities_nearby, a 0-100 score with its level, total_ix_presence, total_networks, and top_facilities each with ix_count and net_cget_permitting_intel~354 tokens
Use this when the user asks about data center permitting or moratoriums — curated, HUMAN-VERIFIED jurisdiction records: moratoriums, zoning restrictions, tax changes, utility pauses. Each record is stage-tagged (read the detail prefix: "Enacted" / "Proposed" / "Speculative"), with jurisdiction, statget_pipeline~577 tokens
Use this when the user asks what data centers are being built, announced or permitted in a market or by an operator. Example: "What data centers are under construction in Northern Virginia and when do they come online?" — get_pipeline country=US status=construction (there is no `market` parameter —get_power_availability_timeline~539 tokens
Use this when the user asks when power will be available, or about time-to-power, in a US state: year by year. Composes: new generation coming online from EIA-860M monthly, split by confidence class (under-construction vs planned vs testing — never blended); scheduled retirements as dated subtractioget_power_pipeline~526 tokens
Use this when the user asks where new power generation is coming online (the forward supply pipeline) — e.g. "how much new generation is planned in Virginia / the Southeast / ERCOT, and when?". Planned, permitting, and under-construction generators NATIONWIDE from EIA-860M, INCLUDING non-ISO regionsget_refined_queue~1020 tokens
Use this when you need interconnection queue projects filtered server-side. Instead of pulling the raw queue into context to filter (token-expensive, error-prone), push the predicates to the data layer and get back ONLY the survivors. Filter by min_mw, max_ttp_months (ISO-level avg interconnection wget_renewable_energy~651 tokens
Use this when the user asks about renewable energy for a data center (execute_plan covers renewables plus siting): siting a renewable-powered data center, sizing a PPA, reading one US state's utility-scale fuel mix, or assessing RE100/24-7-CFE feasibility. Example: "What is Texas wind+solar capacityget_retirement_headroom~656 tokens
Use this when the user asks where retiring power plants free grid capacity: scans EIA-860M retirements to find near-term transmission grid headroom — a retiring plant is a CONCRETE headroom event (its POI frees injection capacity), from FILED data, not forecasts. Returns _entity=retirement_headroom_get_shortlist~217 tokens
Use this when the user wants to see a saved data center site shortlist. With refresh=true (default) each site is RE-SCORED against the current national percentile baseline and returns saved_score, current_score, and score_delta_since_saved — so you see whether a site slipped because IT changed or thget_subsea_cables~581 tokens
Use this when the user asks about subsea (submarine) cable landings near a site, or the cable catalogue. The physical internet crossing an ocean lands at a finite number of points, and distance to one is a real siting factor for anything latency- or transit-sensitive. Pass lat+lon (+radius_km) for Lget_tax_incentives~325 tokens
Use this when the user asks what tax incentives a US state gives data centers — the data-center tax-incentive packages by US state that drive where capex lands. Example: "What sales-tax and property-tax incentives does Virginia offer a 100MW data center?" — get_tax_incentives state=VA. Params: stateget_water_risk~766 tokens
Use this when the user asks about water stress or cooling-water risk at a data center site (execute_plan covers a multi-factor site verdict). Use when scoring a US site for cooling-water sustainability — the water-risk factor engineering site-selectors screen before committing to evaporative coolinggrid_transition_radar~312 tokens
Use this when the user asks where new grid headroom for data centers is emerging. Returns the US markets + ISOs with the strongest near-term emergence signal (BUILD verdict + excess-power headroom + short time-to-power), an ISO rollup, and a grid-headroom leaderboard. With a paid key, also the transhyperscaler_deals~245 tokens
Use this when the user asks about hyperscaler or AI data center deals: live feed of Stargate, OpenAI, Anthropic, Microsoft, Oracle, CoreWeave, AMD, NVIDIA, sovereign-AI deals. Pulls from dchub news pipeline, extracts $-figures + MW via regex, classifies by actor. 10-min refresh. Use for tracking AIlist_saved_sites~338 tokens
Use this when the user asks to see their saved data center sites. Needs a key (free, via claim_free_key); keyless returns auth_required, not an empty list. Use when a user asks to see or review their saved DC Hub shortlist in-chat, or wants to know what moved on it. Example: "What sites have I savedlist_standing_intents~214 tokens
Use this when the user asks which data center watches are registered on their key: webhook watches, plus your capacity requirements (kind "capacity", intent_id cap_...). Read-only. Returns each intent_id, kind, watch params, webhook_url and enabled state; capacity items also carry status, confirmed,list_transactions~586 tokens
Use this when the user asks about data center M&A, acquisitions or capital deals — 1,800+ tracked deals (2019-present), each with its disclosed value where public (many private deals are undisclosed). Returns deal name, buyer, seller, value, date, market, target operator, type (acquisition/JV/refinaplan_fiber_leadin~518 tokens
Use this when the user asks how to get diverse fiber into a data center site: plans road-following lead-in routes from a candidate data-center site to a carrier hotel / POP, with indicative build cost and a route-diversity read. Answers "can I get N diverse fibre routes into this site, how far, howplan_query~493 tokens
Use this when you want to see the plan for a data center question without running it (execute_plan runs the same planner and returns the answers). Reach for plan_query only to review, log, diff or audit a plan before executing it yourself. Deterministic keyword routing over the tool registry — no LLpredict_market_trajectory~442 tokens
Use this when the user asks where a data center market's power outlook is heading (next 1-8 quarters). Projects excess_power_score and constraint_score forward with confidence bands that WIDEN with horizon, from DC Hub's daily DCPI snapshot history, a time-series DC Hub owns. Use to answer "is thisrank_markets~727 tokens
Use this when the user wants a ranked list of data-center markets, including where a data center can get grid power (criteria="ai_ready", DCPI): top N by cheapest_power, most_capacity, most_operators, fastest_growing, best_overall, or ai_ready (where new AI load can land, per DCPI). Filter by regionrank_sites~914 tokens
Use this when you have enriched candidate data center sites to rank under constraints — the normalization contract that lets you compare sites across separate analyze_site calls WITHOUT dropping into code. Pass candidates you already enriched (each an object with lat/lng + metric fields like risk_reread_inbox~198 tokens
Use this when a partner key reads its DC Hub inbox. PARTNER KEY ONLY: notes DC Hub left for the partner agent whose key this session sends, newest first. The first read CONSUMES them (marks read), so a later session sees none; include_read=true re-reads read and unread notes (last 14 days) without mrecover_my_key~191 tokens
Use this when the user lost their DC Hub key. Pass your human's email and DC Hub re-sends any key tied to that address to that inbox. It NEVER returns the key over the wire (it emails the bound address), and the confirmation is the same whether or not a key exists (enumeration-safe), so no key is leregister_standing_intent~1158 tokens
Use this when the user wants a webhook when data center deals change: Register a STANDING QUERY with webhook push — DC Hub POSTs an HMAC-signed webhook to YOUR https URL whenever matches grow (push, not poll: "notify my orchestrator on any new deal in Columbus"). Requires a key. Params: kind ("new_dreport_finding~624 tokens
Use this when a partner key reports a DC Hub data issue. PARTNER KEY ONLY: file what you observed on a DC Hub surface as a brain finding (detector external_audit) so it is triaged like every other detector's. class is one of completeness_contradiction, geography_leak, as_of_cite_as, pro_wall_dead_enrequest_capacity_intro~983 tokens
Use this when the user wants data center capacity behind a Capacity Source listing (pass slug), or wants first access to capacity matching a requirement as listings are onboarded (omit slug; pass capacity_mw or capacity_kw, markets, states, regions or countries, and timeline). This registers a deal:research_task~366 tokens
Use this when the user wants an async, cited data center research dossier from DC Hub's corpora (news, deals, facilities, market deep-dive narratives + live market components) — a decision-ready analyst brief with [n] citations, not a lookup. Requires a key (one claim_free_key call), 5 dossiers/day.save_site~602 tokens
Use this when the user wants to save a data-center site to track it. Needs a key (free, via claim_free_key); keyless returns auth_required. Save a candidate data-center site to your DC Hub account to track it across sessions. Give lat + lon (plus optional name, state, market, target_mw, notes). Retusave_to_shortlist~488 tokens
Use this when the user wants to keep a data center site on a named shortlist that survives across conversations (Phase 5 statefulness). Snapshots the site's objectives + its current percentile objective_score, so you can re-score it later against the evolving national baseline. Use to build a durablscore_facility~315 tokens
Use this when the user wants a 0-100 grade for one existing data center facility across 7 dimensions — power, fiber, water, climate_risk, tax_environment, talent_pool, expansion. Example: "How does the CoreWeave Las Vegas site score, power-weighted?" — score_facility facility_id=<id> weighting=powersearch~174 tokens
Use this when a Deep Research or ChatGPT-connector client needs a data center facility search (search/fetch format). Returns a list of matching data-center facilities as {id, title, url}; pass an id to the `fetch` tool for the record, or open the url to cite the live facility page. For structured qusearch_facilities~625 tokens
Use this when the user asks which data centers exist, or who operates in a city, state or country; filters: country, state, city, operator, MW range, tier or text. Returns name, operator, location, market, status and MW where disclosed; each row is flagged verified or unverified_directory_listing. Fsearch_intelligence~494 tokens
Use this when you need meaning-based search over DC Hub's data center intelligence corpus, choosing corpora — industry news, M&A deals, discovered facilities, per-market DCPI narratives, press releases, announcements, permitting intel, construction permits, tax incentives and the capacity pipeline —semantic_search~531 tokens
Use this when a data center or energy question is conceptual or fuzzy and keyword filters fall short — semantic (meaning-based) retrieval across DC Hub's industry news, M&A deals, the global facility map, per-market DCPI deep-dive narratives, press releases, announcements, permitting intel, construcset_market_alert~399 tokens
Use this when the user wants alerts on a data center market's DCPI power score: subscribes to movement alerts (free with a key) — get notified when its Excess-Power / Constraint score moves. On the free tier, email alerts are delivered to the email your human bound via bind_email (call bind_email fiset_shortlist_alert~338 tokens
Use this when the user wants a drift alert on a saved site shortlist so you can stop polling and be notified when a site's national standing moves materially (Phase 5). Fires when any site in the shortlist has current percentile score < percentile_below OR score_delta_since_saved < delta_below (e.g.set_site_alert~530 tokens
Use this when the user wants an email watch on a saved data center site (free with a key) — DC Hub emails you when that site’s DCPI score, grid capacity, or nearby facilities move, so you don’t have to keep re-checking. On the free tier the alert is delivered to your human’s bound email (call bind_esimulate_scenario~565 tokens
Use this when the user asks how data center power market rankings change under what-if conditions: re-scores 300+ DC Hub markets under your deltas. Params (all optional, pass at least one delta): avg_kwh_cents_pct (power-price % change, e.g. 30), time_to_power_months_delta (months added/removed), qusite_selection_canvas~690 tokens
Use this when the user wants guided data-center site selection. Give a capacity target + geography + deadline and get a ranked shortlist of US markets (DCPI verdict, excess-power headroom, time-to-power, ISO) — and, with a paid key, the synthesis decision layer: the #1 pick, the why, a build sequencsource_capacity~1134 tokens
Use this when the user needs data center or colocation capacity to buy or lease: search DC Hub Capacity Source by size (kW or MW) and/or location (a region such as North America or Europe, a country, a state or a metro). Example: "500 kW anywhere in Europe" → min_kw=500, region=europe. Size is min_ksubscribe_digest~285 tokens
Use this when the user asks for a weekly data center market email: subscribes them to a free digest of what changed in the markets and sites they queried (DCPI movers, new facilities, deals, news). DOUBLE opt-in + consent-safe: we email a one-click CONFIRM link, the human only gets the digest aftersuggest_reallocation~360 tokens
Use this when a saved data center site drifts (its national standing dropped — surfaced by get_shortlist refresh or a set_shortlist_alert firing), get replacement candidates from the rest of that shortlist so the alert becomes an action, not just a warning (Phase 5). Returns TWO tiers — tier_1_same_summarize_for_citation~649 tokens
Use this when you quote a DC Hub data center or power figure: returns one paste-ready attribution line for the value you are about to cite, with the CORRECT licence for that layer. Pass what you read off the response you are citing: subject (what the figure is), as_of (the provenance as_of), url (thunlock_more_data~318 tokens
Use this when the user asks how to get full (non-preview) DC Hub data center results. Returns the access options with links for the user to open. If this call carries an API key or an MCP session, the checkout binds to it and your very next call returns full data (no reconnect); if it carries neithewhy_dchub~112 tokens
Use this when the user asks what DC Hub covers, where its data center, power grid and energy data comes from, how current it is, or what it does not cover. Returns a factual coverage summary: coverage, sources, feed freshness, published limits and the citation format. Free, no key. Not for data quer
Browse
Related MCP servers
- Neso
NESO MCP — Great Britain electricity grid open data (api.neso.energy) - Georgia Energy
Georgia (country) electricity system — live grid telemetry and regulator statistics. - Theaslangroupllc Pulsenetwork
914 paid market-data & token-safety endpoints — keyless x402 USDC: Base, Solana, XRPL, +8 chains - Iso Ne
Real-time power grid data for ISO New England, the electricity market and grid operator for… - Watt Street — US grid, interconnection queue and data center power
How long to get grid power in any US county. 39,173 filings, 1,574 counties, dated sources. - Energy Charts
Energy-Charts (Fraunhofer ISE) MCP — European electricity generation, prices, and capacity.… - ScienceShot data-centre intelligence
Dated counts on European data-centre markets, grid connections, rules and the live grid. - 787daily
Puerto Rico news summaries and live island conditions from 787daily, read-only over MCP.
Badge for your README
[](https://aptlynx.net/servers/cloud.dchub/mcp-server)
Listing text is written by the maker; AptLynx lists tools and does not vouch for them. Find another tool · Browse by topic · For agents